CASE STUDY
Leading Cosmetic Provider: manufacturing systems and materials handling systems.
ENERGY AUDIT
Bureau Veritas performed a Level 3 investment-grade energy audit that included building systems, manufacturing systems, and material handling systems. Several plants had electric forklifts and other efficient systems, and part of BV’s role was to validate achieved energy savings on these systems.
The goals of the project were to:
To produce an Energy Reduction Road Map of Energy Conservation Measures
To Reach -40% reduction in Kwh/1000FG before 2030 from the 2019Baseline
This project was considered a pilot project and included four plants in the United States, and 15 plants outside of the Continental United States.
SERVICE: Detailed Investment-Grade Energy Audit
SIZE & LOCATION: 4 Sites in US, 15 Sites outside of US
FACILITY TYPE: Industrial